BAU Campus Project Introduction

We are building a 10,000 student capacity university campus on over 105 Acres of development land. The campus will be a reference point for learning, student life, research and entrepreneurship in Sub-Saharan Africa. The campus is designed to be a Walkable Campus, a Collection of Memorable Spaces, a Conservation area and to be self-sustaining.

  • Project Site: Nigeria
  • Expected Completion Date: September 2015
  • Stage: Development
  • Project Consultants:
    1. Bver Group Corp (General Contractors)
    2. JGal Studio (Designers / Architects)
    3. Transall Nigeria Limited (Building and Construction)
    4. Axial Nigeria Limited (Building and Construction)
    5. Antigravity Solutions Limited (IT and Telecom)
    6. Henin Nigeria Projects (Pre-Development)